Bundoora Clinical Teaching Building construction – pedestrian detours

If you are walking near the Bundoora Clinical Teaching Building construction site (formerly Car Park 11), be on the lookout for pedestrian detours.

Detours will be put in place to allow the construction team to install scaffolding.

Sections of the pedestrian path will be closed and pedestrians will be redirected to the other side of Science Drive to allow for safe passage.

The detour will be in place on Saturday 22 February (7 am-1 pm) and Tuesday 25 to Friday 28 February (daily). There will be traffic controllers on site to assist pedestrians with the changed access.

The Science Drive (west) footpath will be clear and reopened at the end of each day for pedestrians to use.

Map showing the temporary pedestrian path location.